As demand for electricity soars, U.S. electric utilities are set to invest over $1.1 trillion by 2030, according to the latest Edison Electric Institute (EEI) report. But even with record-level capital expenditures, the timeline to build long-term grid infrastructure is struggling to keep up, especially when it comes to the explosive growth in data center power solutions needs.
At Life Cycle Power, we specialize in fast, reliable energy solutions that bridge the gap between rising power demand and delayed grid readiness. Our mobile gas turbine fleet provides scalable, dispatchable power when and where it’s needed especially in regions where permanent infrastructure isn’t yet in place.
Why It Matters for Data Centers
The EEI reports that utilities brought 52 GW of new generating capacity online in 2024, driven mostly by solar and storage. But data centers, particularly those powering AI workloads, can’t rely on intermittent sources alone. They need firm, 24/7, reliable power for data centers and that’s where flexible generation comes into play.
According to McKinsey, data center power supply demand could grow from 60 GW today to as much as 300 GW by 2030. But not all projects will have utility connections ready on time. This is why many developers are now including mobile gas turbine solutions in their planning either as a bridge, backup, or even as a primary power source during peak demand or infrastructure delays.
The Role of Mobile Power in a High-Demand Landscape
From supporting mission-critical AI computing to enabling new manufacturing operations, reliable energy is no longer optional, it’s a competitive necessity.
At Life Cycle Power, we provide:
- Bridging power for data centers under construction or waiting on interconnection
- Fast-deploying backup solutions in the event of grid outages or commissioning delays
- Mobile gas turbine systems for black start, peak shaving, or standby generation
Our fleet includes over 1.2 GW of turnkey power, available across the U.S., and is fully engineered for mobility, speed, and operational resilience.
Energy Security Through Flexibility
Even with historic utility investments, the truth is: the grid can’t grow fast enough to meet today’s speed of digital transformation. As data center developers, utilities, and industrial operators race to keep up, mobile gas turbine solutions provide the missing link, delivering power for data centers exactly when and where it’s needed. Contact us today: 361-551-6023.