Step
1
of
3
33%
STEP 1. DEFINE YOUR POWER
What needs power?
(Required)
When do you need it?
(Required)
How much do you need? (Max kW)
(Required)
How long do you need it?
(Required)
What voltage do you need?
(Required)
120V - Residential single-phase power
240V - Residential appliances (e.g., dryers, ovens)
208V - Commercial three-phase power
277V - Commercial lighting
480V - Industrial three-phase power
600V - Specialized industrial applications
2400V - Older industrial systems
4160V - Medium voltage for industrial and large facilities
13.2 kV - Distribution networks
24.9 kV - Sub-transmission and distribution
34.5 kV - Sub-transmission
69 kV - Lower range transmission
115 kV - Transmission
138 kV - Transmission
230 kV - High voltage transmission
345 kV - High voltage transmission
500 kV - Ultra-high voltage transmission
765 kV - Ultra-high voltage transmission
STEP 2. DEFINE YOUR FUEL
Define your fuel
(Required)
Propane
Diesel
Pipeline Natural Gas
Trucked Natural Gas
Hydrogen Blend
Do you have it or do you need it?
(Required)
I have It
I Need It - Life Cycle can secure the fuel for your project
STEP 3. DEFINE YOUR LOCATION
Where is your site?
How big is the available footprint?
Any noise limits?
Any emission limits?
Email Address
(Required)
Phone Number
(Required)
Comments
This field is for validation purposes and should be left unchanged.
0% Completed!
Previous
Next